Item List 261514 |
Date:07/31/2026 |
|
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 261514 | Primary Project Number | DE01300152607 |
| Contract Description | HIGHWAY 15 (KY 15) | ||
| Primary County | BREATHITT | Fed/St Number | PROT 0151096 |
| Vendor ID | 03623 | Vendor Name | TRITON CONSTRUCTION INC |
| Bid Amount | $ 43,489,000.00 | ||
| SM- Project | DE01300152607 |
| Fed/State Number | PROT 0151096 |
| Project Description | HIGHWAY 15 (KY 15) |
| *********** |
| SM- Project | DE01300152607 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0005 | CRUSHED STONE BASE | 00003 | 22,692.000 |
22,692.000 |
$49.950 |
TON | 2.6 |
| 0010 | ASPHALT SEAL AGGREGATE | 00100 | 101.000 |
101.000 |
$136.750 |
TON | 0.0 |
| 0015 | ASPHALT SEAL COAT | 00103 | 12.000 |
12.000 |
$965.000 |
TON | 0.0 |
| 0020 | LEVELING & WEDGING PG64-22 | 00190 | 903.000 |
903.000 |
$180.450 |
TON | 0.4 |
| 0025 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 4,063.000 |
4,063.000 |
$162.150 |
TON | 1.5 |
| 0030 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 8,212.000 |
8,212.000 |
$164.450 |
TON | 3.1 |
| 0035 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 1,073.000 |
1,073.000 |
$180.450 |
TON | 0.4 |
| 0040 | CL3 ASPH SURF 0.38D PG64-22 | 00339 | 1,864.000 |
1,864.000 |
$180.450 |
TON | 0.8 |
| 0045 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 514.000 |
514.000 |
$43.850 |
TON | 0.1 |
| 0050 | JOINT ADHESIVE | 20071EC | 18,065.000 |
18,065.000 |
$0.600 |
LF | 0.0 |
| 0055 | ASPHALT MATERIAL FOR TACK NON-TRACKING | 24970EC | 20.000 |
20.000 |
$775.000 |
TON | 0.0 |
Category Total $3,909,941.90 |
| SM- Project | DE01300152607 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0060 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 1.000 |
1.000 |
$110.000 |
TON | 0.0 |
| 0065 | PERFORATED PIPE-4 IN | 01000 | 513.000 |
513.000 |
$10.000 |
LF | 0.0 |
| 0070 | NON-PERFORATED PIPE-4 IN | 01010 | 7.000 |
7.000 |
$60.000 |
LF | 0.0 |
| 0075 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 1.000 |
1.000 |
$2,500.000 |
LS | 0.0 |
| 0080 | PERF PIPE HEADWALL TY 1-4 IN | 01020 | 1.000 |
1.000 |
$805.000 |
EACH | 0.0 |
| 0085 | DELINEATOR FOR BARRIER - WHITE | 01984 | 81.000 |
81.000 |
$16.670 |
EACH | 0.0 |
| 0090 | DELINEATOR FOR G/R BI DIRECTIONAL WHITE | 01987 | 28.000 |
28.000 |
$14.240 |
EACH | 0.0 |
| 0095 | RELOCATE TEMP CONC BARRIER | 02003 | 4,120.000 |
4,120.000 |
$8.500 |
LF | 0.1 |
| 0100 | REMOVE PAVEMENT | 02091 | 642.000 |
642.000 |
$16.000 |
SQYD | 0.0 |
| 0105 | TEMP DITCH | 02159 | 2,800.000 |
2,800.000 |
$2.650 |
LF | 0.0 |
| 0110 | CLEAN TEMP DITCH | 02160 | 1,400.000 |
1,400.000 |
$2.400 |
LF | 0.0 |
| 0115 | ROADWAY EXCAVATION (REVISED 5-19-26) | 02200 | 3,053,981.000 |
3,053,981.000 |
$10.000 |
CUYD | 70.2 |
| 0120 | GRANULAR EMBANKMENT (REVISED 5-19-26) | 02223 | 6,157.000 |
6,157.000 |
$18.000 |
CUYD | 0.3 |
| 0125 | WATER | 02242 | 200.000 |
200.000 |
$69.000 |
MGAL | 0.0 |
| 0130 | FENCE-4 FT CHAIN LINK | 02273 | 180.000 |
180.000 |
$36.830 |
LF | 0.0 |
| 0135 | DOUBLE VEHICULAR CHAIN LINK GATE (24' WIDE GATE) | 02287 | 1.000 |
1.000 |
$6,868.900 |
EACH | 0.0 |
| 0140 | G/R-W BEAM-S FACE TL-3 | 02351 | 1,687.500 |
1,687.500 |
$31.890 |
LF | 0.1 |
| 0145 | G/R END TREATMENT TYPE 1 | 02367 | 3.000 |
3.000 |
$3,397.560 |
EACH | 0.0 |
| 0150 | G/R END TREATMENT TYPE 1 | 02367 | 2.000 |
2.000 |
$3,397.560 |
EACH | 0.0 |
| 0155 | REMOVE G/R | 02381 | 1,285.000 |
1,285.000 |
$3.060 |
LF | 0.0 |
| 0160 | REMOVE & RESET G/R | 02383 | 2,973.000 |
2,973.000 |
$24.930 |
LF | 0.2 |
| 0165 | TEMP G/R | 02397 | 100.000 |
100.000 |
$17.920 |
LF | 0.0 |
| 0170 | RIGHT-OF-WAY MONUMENT TYPE 1 | 02429 | 54.000 |
54.000 |
$325.000 |
EACH | 0.0 |
| 0175 | WITNESS POST | 02432 | 54.000 |
54.000 |
$325.000 |
EACH | 0.0 |
| 0180 | CHANNEL LINING CLASS IV | 02488 | 818.000 |
818.000 |
$65.000 |
CUYD | 0.1 |
| 0185 | CLEARING AND GRUBBING APPROX. 151 ACRES | 02545 | 1.000 |
1.000 |
$1,250,000.000 |
LS | 2.9 |
| 0190 | CONCRETE-CLASS B | 02555 | 2.250 |
2.250 |
$2,200.000 |
CUYD | 0.0 |
| 0195 | TEMPORARY SIGNS | 02562 | 650.000 |
650.000 |
$21.000 |
SQFT | 0.0 |
| 0200 | EDGE KEY | 02585 | 159.000 |
159.000 |
$42.650 |
LF | 0.0 |
| 0205 | FABRIC-GEOTEXTILE CLASS 1 (ADDED 3-19-26) | 02602 | 10,030.000 |
10,030.000 |
$4.020 |
SQYD | 0.1 |
| 0210 | FABRIC-GEOTEXTILE CLASS 2 FOR PIPE | 02607 | 1,072.000 |
1,072.000 |
$2.000 |
SQYD | 0.0 |
| 0215 | FABRIC-GEOTEXTILE CLASS 4A | 02608 | 64,082.000 |
64,082.000 |
$4.750 |
SQYD | 0.7 |
| 0220 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$354,074.300 |
LS | 0.8 |
| 0225 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 2.000 |
2.000 |
$18,000.000 |
EACH | 0.1 |
| 0230 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$10,800.000 |
LS | 0.0 |
| 0235 | SAFELOADING | 02690 | 20.100 |
20.100 |
$700.000 |
CUYD | 0.0 |
| 0240 | SHOULDER RUMBLE STRIPS | 02696 | 9,830.000 |
9,830.000 |
$0.250 |
LF | 0.0 |
| 0245 | TEMP SILT FENCE | 02701 | 2,800.000 |
2,800.000 |
$4.000 |
LF | 0.0 |
| 0250 | SILT TRAP TYPE A | 02703 | 152.000 |
152.000 |
$360.000 |
EACH | 0.1 |
| 0255 | SILT TRAP TYPE B | 02704 | 152.000 |
152.000 |
$140.000 |
EACH | 0.0 |
| 0260 | SILT TRAP TYPE C | 02705 | 152.000 |
152.000 |
$200.000 |
EACH | 0.1 |
| 0265 | CLEAN SILT TRAP TYPE A | 02706 | 152.000 |
152.000 |
$360.000 |
EACH | 0.1 |
| 0270 | CLEAN SILT TRAP TYPE B | 02707 | 152.000 |
152.000 |
$140.000 |
EACH | 0.0 |
| 0275 | CLEAN SILT TRAP TYPE C | 02708 | 152.000 |
152.000 |
$200.000 |
EACH | 0.1 |
| 0280 | STAKING | 02726 | 1.000 |
1.000 |
$350,000.000 |
LS | 0.8 |
| 0285 | CONC BARRIER WALL TYPE 9T (REVISED 5-19-26) | 03171 | 1,177.000 |
1,177.000 |
$45.000 |
LF | 0.1 |
| 0290 | EROSION CONTROL BLANKET | 05950 | 67,768.000 |
67,768.000 |
$1.850 |
SQYD | 0.3 |
| 0295 | TEMP MULCH | 05952 | 488,000.000 |
488,000.000 |
$0.300 |
SQYD | 0.3 |
| 0300 | TEMP SEEDING AND PROTECTION | 05953 | 366,000.000 |
366,000.000 |
$0.430 |
SQYD | 0.4 |
| 0305 | INITIAL FERTILIZER | 05963 | 76.000 |
76.000 |
$1,400.000 |
TON | 0.2 |
| 0310 | MAINTENANCE FERTILIZER | 05964 | 38.000 |
38.000 |
$1,400.000 |
TON | 0.1 |
| 0315 | SEEDING AND PROTECTION | 05985 | 665,700.000 |
665,700.000 |
$0.650 |
SQYD | 1.0 |
| 0320 | AGRICULTURAL LIMESTONE | 05992 | 454.000 |
454.000 |
$110.000 |
TON | 0.1 |
| 0325 | SBM ALUM SHEET SIGNS .080 IN | 06406 | 163.000 |
163.000 |
$41.310 |
SQFT | 0.0 |
| 0330 | SBM ALUM SHEET SIGNS .125 IN | 06407 | 162.000 |
162.000 |
$42.930 |
SQFT | 0.0 |
| 0335 | STEEL POST TYPE 1 | 06410 | 669.000 |
669.000 |
$22.120 |
LF | 0.0 |
| 0340 | STEEL POST MILE MARKERS | 06412 | 1.000 |
1.000 |
$335.370 |
EACH | 0.0 |
| 0345 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 4,640.000 |
4,640.000 |
$0.180 |
LF | 0.0 |
| 0350 | PAVE STRIPING-TEMP PAINT-6 IN | 06511 | 43,200.000 |
43,200.000 |
$0.220 |
LF | 0.0 |
| 0355 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 2,821.000 |
2,821.000 |
$0.300 |
LF | 0.0 |
| 0360 | PAVE STRIPING REMOVAL-4 IN | 06530 | 710.000 |
710.000 |
$0.550 |
LF | 0.0 |
| 0365 | PAVE STRIPING REMOVAL-6 IN | 06531 | 11,620.000 |
11,620.000 |
$0.550 |
LF | 0.0 |
| 0370 | PAVE STRIPING-THERMO-6 IN W | 06542 | 11,450.000 |
11,450.000 |
$1.120 |
LF | 0.0 |
| 0375 | PAVE STRIPING-THERMO-6 IN Y | 06543 | 11,760.000 |
11,760.000 |
$1.120 |
LF | 0.0 |
| 0380 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 42.000 |
42.000 |
$15.000 |
LF | 0.0 |
| 0385 | PAVE MARKING-THERMO CURV ARROW | 06574 | 12.000 |
12.000 |
$110.000 |
EACH | 0.0 |
| 0390 | PAVEMENT MARKER TY IVA-BY TEMP | 06588 | 2,160.000 |
2,160.000 |
$8.000 |
EACH | 0.0 |
| 0395 | INLAID PAVEMENT MARKER-MW | 06610 | 144.000 |
144.000 |
$28.000 |
EACH | 0.0 |
| 0400 | INLAID PAVEMENT MARKER-BY | 06612 | 75.000 |
75.000 |
$28.000 |
EACH | 0.0 |
| 0405 | CONCRETE-CLASS A | 08100 | 12.620 |
12.620 |
$2,500.000 |
CUYD | 0.1 |
| 0410 | CRASH CUSHION TY 6 CLASS T TL3 | 08912 | 2.000 |
2.000 |
$5,161.200 |
EACH | 0.0 |
| 0415 | FUEL ADJUSTMENT | 10020NS | 560,772.000 |
560,772.000 |
$1.000 |
DOLL | 1.3 |
| 0420 | ASPHALT ADJUSTMENT | 10030NS | 59,473.000 |
59,473.000 |
$1.000 |
DOLL | 0.1 |
| 0425 | TREE (ROSE BUD) | 20000ES724 | 111.000 |
111.000 |
$357.550 |
EACH | 0.1 |
| 0430 | OBJECT MARKER TY 3 | 20191ED | 5.000 |
5.000 |
$27.980 |
EACH | 0.0 |
| 0435 | SAW CUT | 20430ED | 4,765.000 |
4,765.000 |
$3.000 |
LF | 0.0 |
| 0440 | CENTERLINE RUMBLE STRIPS | 20458ES403 | 5,216.000 |
5,216.000 |
$0.320 |
LF | 0.0 |
| 0445 | LONGITUDINAL EDGE KEY | 21289ED | 2,272.000 |
2,272.000 |
$6.450 |
LF | 0.0 |
| 0450 | PAVE MARK TEMP PAINT STOP BAR-24 IN | 23010EN | 59.000 |
59.000 |
$15.000 |
LF | 0.0 |
| 0455 | TURF REINFORCEMENT MAT 1 | 23274EN11F | 2,460.000 |
2,460.000 |
$5.000 |
SQYD | 0.0 |
| 0460 | REMOVE AND RESET CRASH CUSHION | 23624EC | 2.000 |
2.000 |
$3,302.970 |
EACH | 0.0 |
| 0465 | BARCODE SIGN INVENTORY | 24631EC | 46.000 |
46.000 |
$18.690 |
EACH | 0.0 |
| 0470 | PIPELINE INSPECTION | 24814EC | 793.000 |
793.000 |
$4.000 |
LF | 0.0 |
| 0475 | PGR GROUT | 26204EC | 6.000 |
6.000 |
$1,200.000 |
CUYD | 0.0 |
| 0480 | ELECTRONIC DELIVERY MGMT SYSTEM - AGG | 26248EC | 1.000 |
1.000 |
$2,300.000 |
LS | 0.0 |
| 0550 | TEMPORARY ROCK CATCHMENT FENCE (ADDED 5-19-26) | 26316ED | 5,360.000 |
5,360.000 |
$152.000 |
LF | 1.9 |
Category Total $36,400,384.09 |
| SM- Project | DE01300152607 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0485 | CULVERT PIPE-18 IN | 00462 | 81.000 |
81.000 |
$250.000 |
LF | 0.0 |
| 0490 | CULVERT PIPE-24 IN | 00464 | 172.000 |
172.000 |
$290.000 |
LF | 0.1 |
| 0495 | CULVERT PIPE-30 IN | 00466 | 86.000 |
86.000 |
$310.000 |
LF | 0.1 |
| 0500 | CULVERT PIPE-36 IN | 00468 | 210.000 |
210.000 |
$375.000 |
LF | 0.2 |
| 0505 | PIPE CULVERT HEADWALL-18 IN | 01204 | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.0 |
| 0510 | PIPE CULVERT HEADWALL-24 IN | 01208 | 6.000 |
6.000 |
$2,600.000 |
EACH | 0.0 |
| 0515 | PIPE CULVERT HEADWALL-30 IN | 01210 | 2.000 |
2.000 |
$3,400.000 |
EACH | 0.0 |
| 0520 | PIPE CULVERT HEADWALL-36 IN | 01212 | 4.000 |
4.000 |
$3,800.000 |
EACH | 0.0 |
| 0525 | BORE AND JACK PIPE-24 IN | 21799EN | 118.000 |
118.000 |
$968.000 |
LF | 0.3 |
| 0530 | BORE AND JACK PIPE-30 IN | 21800EN | 82.000 |
82.000 |
$1,135.000 |
LF | 0.2 |
| 0535 | BORE AND JACK PIPE-36 IN | 24186EC | 98.000 |
98.000 |
$1,380.000 |
LF | 0.3 |
Category Total $560,674.00 |
| SM- Project | DE01300152607 | CATEGORY NUMBER | 0005 | CATEGORY Description | DEMOBILIZATION & MOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0540 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$2,000,000.000 |
LS | 4.6 |
| 0545 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$618,000.000 |
LS | 1.4 |
Category Total $2,618,000.00 |